Villa Ailla
A gallery inside a living home. At Villa Ailla, art isn't only something you look at: you live inside it, add something of your own, and watch it change with the light outside.
- Brief
Place a gallery inside a living home, where art is not only looked at but lived in.
- Approach
Compose immersive projection and spatial sound across the central hall, with scenes by digital artists that follow the light outside, the music and the people in the room.
- Outcome
Ordinary life, a little more cinematic: a hall that helps you recover, changes with the mood in seconds, and answers to the voice.
- Challenges
Let the technology step back: projectors in the timber ceiling, Funktion-One speakers in its grid, Media Canvases in place of paintings, and more than 200 devices out of sight.
- Result
Launching December 2026. A work of art you can live inside.
Living walls · Work in progress
The villa is in its final stage. These are working frames from commissioning — the room with the ladder still in it, the team reading content off the wall, the states the surfaces hold once they are calibrated.
Behind them: more than 200 devices from the speakers to the server room, an iPad operator layer with scene logic, and a full technical audit reconciling four independent source documents into one verified knowledge base, checked port-by-port against the physical rack.
We placed a gallery inside a living home, in a villa whose pure minimalism resonated with the idea at once.
I · Living inside art
At Villa Ailla, art isn't only something you look at. You live inside it. An immersive projection across 120 square metres of the central hall works together with spatial sound, and the space comes alive to whoever is in it. Digital artists have reimagined nature: rice fields become fields of light, water turns into moving pattern, the air becomes a sheet of silk that folds and opens as if carried by a wind that isn't in the room. Some scenes are finished, authored works; others are born in the moment.
The hall follows the light outside: when the sun comes out, the landscape on the walls brightens; when the rain arrives, the space folds into a soft, sheltered dusk. Residents can add something of their own: photos and videos find their place in a night landscape, settling into glowing frames mirrored in the water. Morning coffee, dinner with friends, a slow evening for two: ordinary life stays just as it is, only a little more cinematic.
II · The technology steps back
The technology steps back. Projectors are hidden in the timber ceiling, Funktion-One speakers in its grid. Where a home would usually hang paintings, Villa Ailla has Media Canvases: they are linked to every wall, and in some scenes the art seems to grow out of them into the room. The system counts more than 200 devices, from the speakers to the server room. What you see is the room, and what it chooses to show.








III · Mindfulness Hub
Like nature itself, the art moves gently, and it is easier to recover beside it. When the space around you comes into balance and stops pulling at your attention, the mind holds its thought with ease. Breathwork in the morning, meditation with image and sound in the afternoon, quiet in the evening. This is what the Mindfulness Hub is for: practices composed around the rhythms of the body, and immersive soundscapes for massage and rest.
IV · A change of mood
And when the mood changes, the hall changes with it, in seconds. Feel like a party? Put on your favourite music, or ask Ailla to choose something for the mood, and she will. Thousands of glowing particles answer the music and the voices: louder, and the swarm grows dense and quick; softer, and it settles into a slow shimmer. A wedding, a gathering, a retreat, a quiet dinner: each asks something different of the space, and each is met.
All of this is guided by an interface we conceived especially for Villa Ailla. Choose a mood and carry it further: softer, brighter, slower. Upload your own photos and videos to make them part of a scene. Or simply talk to Ailla: she understands your voice and even hints, so sometimes it is enough to say you would like some quiet.
Villa Ailla is a work of art you can live inside. Opening December 2026.
- Year
- Launching December 2026
- Location
- Lyvin Melasti
- Role
- Concept · Phygital interior & AI scenography · Scene direction · Control interface · Brand · Marketing · Leasing · Ongoing curation
